ADU and New Construction Electrical, Built Right Before the Walls Close.
MAG Electric handles all electrical phases for accessory dwelling units, home additions, and new residential construction across SLO and Santa Barbara Counties.
Most ADUs Need Their Own Panel or Subpanel. We Handle Both.
California's streamlined ADU permitting has driven significant construction across the Central Coast. Most ADUs require a dedicated subpanel fed from the main residence, with separate metering in some cases. We assess your main panel capacity, design the subpanel configuration, and handle all permit and inspection coordination.
ADU subpanel design and installation
Service capacity evaluation on main panel
Rough-in wiring for all ADU circuits
Final device installation coordinated with GC schedule
Permit filing with city or county building department
Utility coordination for separate metering where required
The Cheapest Time to Add EV Conduit Is Before the Walls Are Closed.
During rough-in, adding conduit for a future EV charger circuit, solar-ready provisions, and extra circuit capacity costs a fraction of what it costs after the walls are closed. We discuss your plans during the design phase and rough in for future needs at minimal added cost.
Most ADUs require either a dedicated subpanel or a separate main panel depending on the structure type, local jurisdiction requirements, and whether separate utility metering is requested. We determine the correct configuration for your specific ADU during the free site visit and quote accordingly.
We communicate directly with the GC superintendent, attend pre-construction meetings where required, and coordinate our rough-in, trim, and final phases around the GC schedule. We provide our contact information directly to the GC and are available by phone throughout the project.
We file the electrical permit as a sub-permit under the main building permit or as a standalone electrical permit depending on the jurisdiction. We manage inspection scheduling for rough-in, cover-up inspection if required, and final. You receive a complete permit documentation package at project close.